See it live · For Australian crane hire

Run the whole lift
from one app.

The only crane software that checks every job against the manufacturer's load chart — on the schedule board as you plan it, in the quote, and in your crew's hands. Quote to invoice, with your margin on every lift.

Or on your phone or tablet: iPhone / iPad Android early access

See the whole app running on a busy, real-looking yard — no sign-up, no setup. If it fits how you work, let's talk about a paid pilot or founding-partner program.

Lift Intelligence UTILISATION 77%
120t 60t 0 2m 12m 22m 32m 25t @ 12m within chart · 77%
LTM 1130-5.1 · 130t vs manufacturer MRC
What it does

The job runs in one place, start to finish.

No double entry, no lost dockets, no spreadsheet held together with hope. Every handoff is wired — and every number traces back to a real load chart or a real ticket.

Schedule board

Every drag, checked against the chart

Drop a job on a crane and the board answers instantly — green when the machine can do the lift, flagged when it can't, with the crane's actual rated capacity at that radius. Not a colour someone chose. The chart's verdict, live, as you plan the week.

Lift Intelligence

Quote from the manufacturer's chart

Pick the right crane for the lift — load, hook block and rigging weight all in the maths. See utilisation against the real load chart and build a quote to send the customer on the spot.

Set what the site lets you work to — 80, 90 or 100 percent of chart — and it works out the lightest counterweight that stays under it, and what that saves you against full ballast. That's float movements, not rounding.

Rig & reeving

The crew know before they leave the yard

Each crane carries its standing rig — fitted block, whip line, what travels on the gear truck. When a lift needs more, the job says so in plain words: use the three-sheave block on the gear truck and reeve to 7 parts. On the crew's phones with the allocation.

Allocation

Checked before the truck moves

Put a crane and a crew on a job and three checks run at once: is each bloke inducted for that site and still current on the day it's running, is the crane inducted for that site, and does the operator's licence class cover the machine.

It answers in words, not a red light — Sam is not inducted for Viva Energy Geelong, expired 3 June — and names who is inducted, so the swap takes ten seconds. Every move on the board runs it again against the new date.

Compliance

Nothing slips through

Crane rego, insurance, services and 10-year majors. Crew tickets, VOCs and site inductions with their expiry dates — the licence says he may operate the class, the VOC says he was assessed on that machine.

Rigging gear on the quarterly RGBY cycle with its certificates attached to the item. A fault raised at pre-start lands in the workshop queue against that machine and closes when the service is logged. No phone call in it.

One workflow

Six workspaces, one job

Sales wins the work, Ops allocates the crane and crew, the crew run it and sign it off, payroll gets the hours, the workshop gets the faults — and the owner's Executive view sees the lot. The job carries its own history the whole way.

Get paid

Sign-off to invoice — and payroll that's right

The client signs off on site, the hours come back itemised — ordinary, overtime, standby — and CraneIQ builds the invoice and syncs it straight to your accounting software — Xero, MYOB or QuickBooks — with the paid status coming back when it clears. Wages price off your EBA rates, permanent and casual handled correctly, so nobody's short and nobody's overpaid.

Your numbers

What each machine actually earns

Margin on the quote before you send it — with the wages and the on-costs shown apart, because nobody believes a blended number they can't check.

Then utilisation, per machine, per month, taken straight off the board: hours billed against hours available. Every cost-per-hour figure in a crane business divides by an assumed number of billed hours a year, and that assumption is usually inherited and never tested. A crane costed at 1,500 hours and running 900 is being under-recovered by two thirds. This is the number that tells you.

Ask the yard

The whole business, one straight question away.

Every crane-hire owner already has the answers somewhere — on the board, in the charts, on the timesheets. The assistant just reads them and tells you, in plain words. It never invents a crane, a number or a date; if it doesn't have it, it says so.

"Which crane can lift 20 t at 15 m?"
Scans your fleet's load charts and names the machines that make it — best config, spare margin, hook block already in the maths.
"Why is job J-2287 underwater?"
Points at the driver — weekend double-time, or a job quoted under your rates — not just the number.
"Who can run the 130 on Tuesday?"
Only the blokes licensed for the class and current on that machine — and flags the risky near-misses.
"Who's inducted for Viva Geelong?"
Names the crew current for that site and flags whose induction has lapsed — before anyone's sent out.
"How did we track this month?"
Revenue, margin, utilisation, what you're owed and what's overdue — the owner's view, on demand.

Ask it anything about your yard — the answer comes straight from your own data, never a made-up number.

Watch it work

See CraneIQ run a real job.

Short walkthroughs of each part of the app — the six workspaces your business already runs on.

Real load charts. Real tickets. A workflow that follows the actual job.

— Built for crane hire by an Operator.

Quote → paid
One unbroken workflow across Sales, Ops, Crew, Payroll and Workshop
The right crane, fast
Load, hook block and rigging weighed against the chart — with a quote ready to send
Australia wide
Built for small-to-mid crane hire fleets, on iPad, iPhone and Android
Founding design partner

Build it with us.

Anyone can explore the live demo in seconds. Beyond that, I take on one design partner at a time — a crane company that wants a direct line to me and a real say in what gets built. I hand-onboard you myself: your fleet, rates and load charts loaded for you, and founding terms locked in writing. One spot open now. If that's your yard, let's talk.